Home   |   About CCTA   |   Projects   |    Planning   |   Transit   |   Bike/Ped   Downloads  |   Meetings  |   Extension

 
   
- Issues & Options Report
   
- Final Plan
   
- Bike/Ped
   
- Bike/Ped Funding
 
 
 
 
 
 
Final CBPP
 
Final Countywide Bicycle and Pedestrian Plan

On December 17, 2003, the Contra Costa Transportation Authority adopted its first ever Countywide Bicycle and Pedestrian Plan. The Authority has designed the CBPP to outline bicycle and pedestrian needs for Contra Costa; refine the Authority’s goals and strategies as they apply to bicycling and walking; encourage local efforts to improve the environment for bicycling and walking in the communities of Contra Costa; and spur greater interest in and support for bicycling and walking generally.

The CBPP establishes five goals:

1. Expand, improve, and maintain facilities for bicycling and walking
2. Improve safety for bicyclists and pedestrians
3. Encourage more people to bicycle and walk
4. Support local efforts to encourage walking and bicycling
5. Plan for the needs of bicyclists and pedestrians

For each goal, the CBPP outlines policies and actions to achieve these goals. The Authority will use the goals, policies, and actions, as well as the other material in the cbpp, in its efforts to support bicycling and walking in Contra Costa. Local jurisdictions are encouraged to embrace these goals, too.

The Final CBPP also outlines:

1. A countywide bikeway network consisting of over 600 miles of on- and off-street facilities and 17 priority improvements on that network.


2. Other recommended projects that would:

* Help create a safe and convenient network of pedestrian facilities
* Improve bicycle and pedestrian links to transit
* Otherwise support bicycle and pedestrian movement

3. A program of steps to carry out the CBPP recommendations


4. An atlas of existing and planned bicycle facilities within Contra Costa

The Final CBPP can be downloaded, in PDF format, in several parts:

Chapter File Name

Size

Cover, Executuve Summary and Contents cbpp0.pdf (1.39mb)
Introduction and Goals cbpp1-2.pdf (400kb)
Background cbpp3.pdf (2.73mb)
Bicycle Network cbpp4.pdf (15.7mb)
Pedestrian Network cbpp5.pdf (1.39mb)
Links to Transit, Safety and Support, and Implementation cbpp6-8.pdf (2.83mb)
Bicycle and Pedestrian Design cbppA-B.pdf (3.34mb)
Demand, Funding Sources, and State and Federal Policies cbppC-E.pdf (463kb)
Local Projects cbppF1.pdf (264kb)
Local Project Atlas cbppF2.pdf (5.77mb)
Local Adoption cbppG.pdf (58.6kb)

A single map of the Countywide Bicycle Network covering the entire is also available.


Brad Beck, Senior Transportation Planner
Contra Costa Transportation Authority
3478 Buskirk Avenue, Suite 100
Pleasant Hill CA 94523
 
 
 

 home  |  TDM/TFCA  |  contact info  |  RFP's  |  links  | site map
 © 2003 Contra Costa Transportation Authority. All Rights Reserved.
 Legal Statement  |  Privacy Policy