Home   |   About CCTA   |   Projects   |    Planning   |   Transit   |   Bike/Ped   Downloads  |   Meetings  |   Extension

 
-
 
-
 
-
 
-
 
 

-

 
-
 
 
 
 
-
Measure C Projects
 
Strategic Plan Pages
 
Links To Future Projects 
 
East Central Traffic Management Study
 
Cost Estimating Guide
 
SR4 Corridor Transit   Study
 
I680 Investment Options
 
RT4 Bypass
 

 Public Hearing Announcement


Presentation Boards from Public Hearing


SR4 (East) Widening Project - Federal Admin. Finding of no signficant impact for Loveridge to SR160 (FONSI)
 

State Route 4 (East) Widening Project:
Loveridge Road to State Route 160
Negative Declaration / Initial Study / Environmental Assessment

Cover Cover page, Negative Declaration & General Info (272 k)

Project Summary (52 k)

Table of Contents and List of Abbreviated Terms (44 k)

Chapter 1 Proposed Project (1.12 Mb)

Chapter 2 Affected Environment, Consequences, and Mitigation (4.4 Mb)

Chapter 3 Comments and Coordination (5.4 Mb)

Chapter 4 List of Preparers (24 k)

Chapter 5 Distribution List (20 k)

Chapter 6 Comments and Responses (8.1 Mb)

AppA Fig A - Sheet 1 (~1 Mb)
AppA Fig A - Sheet 2 (~1 Mb)
AppA Fig A - Sheet 3 (~1 Mb)
AppA Fig A - Sheet 4 (~1 Mb)
AppA Fig A - Sheet 5 (~1 Mb)
AppA Fig A - Sheet 6 (~1 Mb)
AppA Fig A - Sheet 7 (~1 Mb)
AppA Fig A - Sheet 8 (~1 Mb)
AppA Fig A - Sheet 9 (~1 Mb)
AppA Fig A - Sheet 10 (~1 Mb)
AppA Fig A - Sheet 11 (~1 Mb)
AppA Fig A - Sheet 12 (~1 Mb)
AppA Fig A - Sheets 1-12 (1.3 Mb)
AppA Fig A - Sheets 1-2 (332 k)

Appendix B CEQA Checklist (2.5 Mb)

Appendix C Title IV Policy (36 k)

Appendix D Relocation Benefits (32 k)

Appendix E Traffic & Transportation (240 k)

Appendix F USFW Biological Opinion (2.1 Mb)

Appendix G Wetlands Finding (24 k)

List of Technical Studies (32 k)

 

 
 

 home  |  TDM/TFCA  |  contact info  |  RFP's  |  links  | site map
 © 2003 Contra Costa Transportation Authority. All Rights Reserved.
 Legal Statement  |  Privacy Policy