State Route 4 Gap Closure (Phase 1)

This project is Phase 1 of a two-phase plan to convert Route 4 into a full freeway between Cummings Skyway and I-80. Phase 1 provides a four-lane, fully divided facility with two new westbound lanes north of the existing highway. The existing highway in that same area was converted into two eastbound lanes.

  • Download comprehensive fact sheet