Martinez Bay Trail

This project completes a 2,600 foot portion of the trail through the City of Martinez. This phase of the trial begins at the existing Nejedly Staging Area on Carquinez Scenic Drive (within the Easy Bay Regional Park District Carquinez Regional Shoreline) and follows an easement along the Union Pacific Railroad right-of-way to the existing public grade crossings at Berrellesa Street. At this point, the trail heads north on the east side of Berrellesa Street and provides a connection into the Martinez Regional Shoreline, which in turn provides connection to downtown Martinez and the existing Bay Trail on Marina Vista to the east.
  • Download comprehensive fact sheet